Are we ready to ship?
Release Readiness
A single 0–100 go/no-go score for one release — with the failing tests, open criticals, and coverage gaps that made it that number.
Every other tool hands you a spreadsheet and wishes you luck. Hawzu turns your requirements, tests, executions, and defects into seven decision-ready reports — each one scored, scoped to a release or run, and built to sign off.
Release Readiness — one release, scored 0–100, with every risk behind the number.
Not here's your data. Each report opens on the exact question someone is about to ask you — and settles it.
Are we ready to ship?
A single 0–100 go/no-go score for one release — with the failing tests, open criticals, and coverage gaps that made it that number.
What's covered — and what caught the bugs?
Every requirement mapped to the tests that cover it and the defects they caught, with a High / Watch / Healthy risk read on every row.
How did this run actually go?
Pass, fail, blocked, and not-run across every test run and release execution — plus the folders quietly dragging the pass rate down.
What's still untested?
How much of your requirements have a test and how much of your suite is automated — per folder and requirement type, with the uncovered requirements listed by name.
Which failures can't be trusted?
The tests that flip pass-to-fail across runs, classified Stable / Unstable / Flaky — a triage shortlist that separates real breakages from noise.
What is CI running that we can't see?
The tests your pipelines run that map to no test case — and the ones quietly getting slower, ranked by the gap between their average and their worst run.
Who did what this sprint?
Who's writing, running, and filing — throughput and capacity per person, with new contributors surfaced and quiet ones flagged.
Real screens from inside Hawzu. Click through each one.
Release Readiness turns four parts of the release into a single 0–100 score — the same rules every time, so the number is a fact, not an opinion. No black box: the report shows how each part scored.
The VP asks the only question that matters — can we ship? You don't share your screen and scroll. You'd already sent one PDF:
The decision arrived before the meeting did.
Measure against a whole release (all its executions), a single execution, or a standalone test run. Release Readiness always locks to one release, so the score means one thing.
Per-report date ranges — Today, 7 / 30 / 90 days, or a custom window — plus search and filters on folder, type, status, and labels.
Pick exactly which sections go in the PDF — and Hawzu remembers next time. Or drop the whole thing into Excel.
Reports are the snapshot you send. When you need the living view, there's a scored Project Health Scorecard, a Release & Execution Analysis workspace with an AI-written readiness narrative, and Observatory dashboards you build yourself.
Every report is on every plan. Free for five people, $20 per member after — no credit card.